3.0.1 Release Plan
The release plan (with dates) is described below:
| Activity | Owner | Delivery Date |
| Set the "3.0.1-RC1" tag, plus build and publish an archive | Steve | October 9 |
| 3.0.1-RC1 archive testing | Community | October 9 thru October 16 |
| 3.0.1 release date (set 3.0.1 tag & create archive) | Steve | October 17 |
Please consider the 3.0 branch to be under change control during the testing phase (October 9 - October 16) with only critical patches being committed. This will be an informal change control process where developers will monitor their own changes.
Please reference to change log for the 3.x branch at: 3.0.1 Change log